On Time and Perfect Delivery as Promised

Reference Projects
Turkey's Automobile Enterprise Group Domestic and Electric Car Factory Construction

In the TOGG production facilities project—Turkey’s first domestic and electric car brand—the comprehensive electrical contracting works of the critically important paint shop and body buildings were successfully delivered.

STAR Refinery Aliaga / Izmir Province Construction Project

In the STAR Refinery project, which realized the integration of refinery and petrochemicals as the largest single-location investment by the private sector in Turkey, the electrical and instrumentation works of the Flare Unit, Jetty No. 3 Port, and Area 2 and 3 LPG tank and pump stations were successfully executed and delivered.

Isdemir Modernization Project

In Turkey’s only and largest integrated plant producing both long and flat products, the medium and low voltage electrical and instrumentation contracting works of the facilities listed below were successfully implemented and delivered as part of the İsdemir modernization project conducted between 2005 and 2012.

EnerjiSA Tufanbeyli / Adana Province Thermal Power Plant Construction Project

Within the scope of the 3 x 150 MW thermal power plant project of Tufanbeyli Domestic Lignite Power Plant—considered Turkey’s largest lignite-based plant built by the private sector—medium and low voltage electrical and instrumentation works were successfully executed and delivered.

DPWorld Dubai Port Yarımca / Kocaeli Province Container Port Construction

In the facility built by DPWorld, the world’s third-largest container operator, and serving as one of Eastern Marmara’s largest container terminals and logistics centers, all medium voltage electrical contracting works of 11 transformer buildings were successfully completed and delivered.

Melet Enerji Ordu Provincial Regulator and HES* Construction Project

Within this project, including the 154 kV Energy Transmission Line and the switchyard facility, all medium and low voltage contracting works were successfully implemented and delivered.
With this project, our company’s capability to construct 154 kV transmission lines and switchyard facilities was officially approved by TEİAŞ.

Hyatt House Gebze / Kocaeli Province Hotel Construction Project

As part of the hotel construction project, medium and low voltage electrical solutions in line with international standards were implemented.

Recep Tayyip Erdogan University Rize Province Campus Construction Project

All engineering and implementation works for the university’s medium and low voltage electrical systems were successfully completed.

Prime Mall Shopping Center

In Primemall İskenderun, the first project in Turkey by Prime Development (a subsidiary of German investment group First Capital Partner GmbH), all medium and low voltage electrical works for the 80,000 m² shopping mall were delivered completely in line with the contractual specifications.

Petrol Ofisi Derince / Kocaeli Province Terminal and Filling Facilities Modernization

As part of the modernization efforts, medium and low voltage renewal works were carried out, enhancing the energy efficiency as well as safety and durability standards of the facility.

Yıldız Entegre Inc. / Medium and Low Voltage Contracting Project

All medium and low voltage contracting works of the Mediterranean Facility, one of the largest investments located in the Mersin Tarsus Organized Industrial Zone with an installed capacity of 41,100 KVA, were successfully completed and delivered.

Hayat Kimya Inc. / Medium and Low Voltage Contracting Project

All medium and low voltage contracting works of the Mersin Plant of Hayat Kimya Inc., with an installed capacity of 32,600 KVA, were successfully executed and delivered.